Cash Flow Tip 14 - Aggressive Billings and Pre-Wiring the Process

A basic Schedule-of-Values (SOV) with flat billings and normal collection processes will yield about a 30% return on capital over the first 12 months of a project when looking at it from a cash basis.

D. Brown Management Profile Picture
Share

This is in the average-high range for contractors, depending on type.  

Cash Flow: Tip 14 Aggressive Billings - Pre-Wiring for Success. From a 12-month 31% return-on-capital at risk which is the high-average for contractors up to a 49% or greater return. Punch-as-You-Go Ensuring Maximum Monthly Billings Percentage of Completions “Sold” Ahead of Billing Change Order Approvals Contractually Required Support Documents Verified Early

Our focus is helping contractors achieve performance in the upper end of their peers, including cash flow. Look at the differences that aggressive management of every aspect of billings can make:

 



Related Training
More from D. Brown Management
Learning, Doing and Teaching
Growth in life, career, and business is about a continual cycle of learning, doing, and teaching.
Executive Briefing - Understanding Industry Trends
The construction industry is changing at an unprecedented rate. The challenges for contractors are compounded by the shortage of talent at all levels, including craft, management, and technical experts.
Be Specific About Problems
The business of construction is filled with constant problems. It’s not that great contractors don’t have problems, it's that great contractors have learned how to troubleshoot first, which allows them to learn from their problems faster.