Project Delivery - Lease Leaseback

Project Owners typically manage the financing of the project. In certain circumstances this does not always make sense, which is where Lease-Leaseback or Build-to-Suit project delivery methods come in.

D. Brown Management Profile Picture
Share

The project may be managed like a Design-Build, where both design and construction are integrated or like CM at Risk, where the Project Owner retains direct control over the design. 

CM at Risk: Project Delivery Methods - Definition of Lease Leaseback and pros and cons.

The difference is that the contractor is partnered with someone who provides the financing for the project and a separate entity is formed for the specific purpose of building the project then leasing it back to the customer.  

The lease may be structured over different time periods and at the end of the lease term, the customer may or may not own the building.

This method allows the Project “Owner” the opportunity to get a facility that suits their very specific needs with no capital outlay up front. Sometimes, the land is owned by the customer and the bare land is leased to the contractor for $1 and then the completed building is leased back to the customer. 


More from D. Brown Management
Learning, Doing and Teaching
Growth in life, career, and business is about a continual cycle of learning, doing, and teaching.
Executive Briefing - Understanding Industry Trends
The construction industry is changing at an unprecedented rate. The challenges for contractors are compounded by the shortage of talent at all levels, including craft, management, and technical experts.
Be Specific About Problems
The business of construction is filled with constant problems. It’s not that great contractors don’t have problems, it's that great contractors have learned how to troubleshoot first, which allows them to learn from their problems faster.