Project Delivery - Design-Bid-Build

The Design-Bid-Build (DBB) method of project delivery is easily the most familiar to owners, architects and contractors.

D. Brown Management Profile Picture
Share

No contractor should ever lose their ability to compete, win, and build profitable projects using this method of delivery. It keeps your estimating and operations teams sharp.

CM at Risk: Project Delivery Methods - Definition of Design-Bid-Build and pros and cons.

In this method, the project owner contracts separately with the architect for design and a single prime contractor for construction.  

  • It is the primary procurement method used for public works projects.
      
  • Due to the sequential design followed by the construction workflow, it has the longest timeline.

  • Contractors are typically forced into a competitive bidding situation, resulting in a low initial construction cost.

  • Because the contractors were not involved in the design phase, there are frequently cost and schedule overruns that sometimes end in litigation.  

The negatives must be weighed against the positives for this project delivery method. In many cases this is absolutely the right method for the project.


More from D. Brown Management
Learning, Doing and Teaching
Growth in life, career, and business is about a continual cycle of learning, doing, and teaching.
Executive Briefing - Understanding Industry Trends
The construction industry is changing at an unprecedented rate. The challenges for contractors are compounded by the shortage of talent at all levels, including craft, management, and technical experts.
Be Specific About Problems
The business of construction is filled with constant problems. It’s not that great contractors don’t have problems, it's that great contractors have learned how to troubleshoot first, which allows them to learn from their problems faster.