Time-on-Tools and Minimum Required Installation (1)

Labor productivity IS NOT the biggest problem with field productivity. Under similar conditions the variation in how fast two crafts people actually “turn wrenches” is about 2X but there are far bigger problems to tackle. Focus on these three areas.

D. Brown Management Profile Picture
Share

 

Field Productivity: Labor Productivity IS NOT The Biggest Problem With Project Productivity

 

  1. Maximize Time-on-Tools (ToT): Ensure that crafts people spend most of their day working with their tools actually installing things.  Different studies place the industry average between 50-65%.  Leverage the 6 Pillars of Productivity and ABC Daily Planning.  
  2. Minimum Required Installation (MRI): Don’t take critical shortcuts but don’t over-build the project.  In the field we would call it “Gold Plating.” Effective installation details, craft training and good field supervision practices will ensure that you get the right level of quality. 
  3. Minimize Rework: The only greater waste than installing more than what is required is doing it twice.

General Contractors and Project Owners can do a lot to set the conditions for success with their labor-intensive subcontractors. 


4 Elements of an Effective Task

Site Logistics Management


Time-on-Tools and Minimum Required Installation (1)
Field labor is the often the biggest variable on a construction project - making it the biggest risk and opportunity....

Related Training
Time-on-Tools and Minimum Required Installation (1)
Field labor is the often the biggest variable on a construction project - making it the biggest risk and opportunity....

Lean Principle - Value Add vs. Non Value Add
For specialty contractors the field workforce represents most of their competitive advantage as well as their biggest source of variability. Making improvements to field productivity requires deeply understanding what truly adds value to the customer.
Change Orders and Average Cost Impact to the Project (Industry Survey)
Changes are a part of the construction process with many underlying causes. While we have all heard the average of 10% changes on construction projects, it is interesting to look at an industry study for validation.
Planning - Integrating the 4 Key Responsibilities
Effective planning combined with regular feedback (at least weekly) combined with a structured look at how to improve each week is the key to integrating the four key responsibilities of a Foreman.