The Best Contracting Methods for Preconstruction Services

Moving seamlessly from preconstruction to construction requires solid contractual documents modified to fit your particular project and structure.

Raymond Braswell Profile Picture
Share
Contributors David Brown Profile PictureDavid Brown

Spell Out Responsibilities and Scope Including:

  • Your fee and structure
  • Owner responsibility to respond quickly including making decisions
  • Architect's responsibility to meet their design milestones
  • Rolling directly into a construction contract with those terms already defined

Remember that your objective is to move from Preconstruction Services into a Construction Manager at Risk (CMAR) contract.  

 


There are many nuances and modifications to the standard contracts from AIA or Consensus Docs to suit your specific project and preconstruction needs.  Please schedule some time to talk with Raymond about your specific situation and contract documents.  

 

Learn more about building Advanced Preconstruction Services and Business Development capabilities along with other General Contractor Solutions for profitable growth in all economic conditions.   


The Best Contracting Methods for Preconstruction Services
Dominate your competition by contracting for preconstruction services while projects are still concepts on scratch paper. This series of videos will look at the preconstruction process from the perspective of the Project Owner, Architect, and Contractor. ...

The Best Contracting Methods for Preconstruction Services
Dominate your competition by contracting for preconstruction services while projects are still concepts on scratch paper. This series of videos will look at the preconstruction process from the perspective of the Project Owner, Architect, and Contractor. ...

Weekly Design Meetings and Protecting Finishes
Finishes and other key design elements are important for both the project owner and architect. A contractor providing preconstruction services must focus on protecting these throughout the design-development process.
Job Instruction (JI): A 1940s Solution to the Craft Labor Shortage
The shortage of qualified craft labor, crew leaders, and supervisors has been solved before - just not in our lifetimes. The lessons from the Training Within Industry (TWI) and specifically the Job Instruction (JI) training can be used by any contractor.
Improving Team Morale
If morale on your team is low then it’s probably your fault. Those words sound harsh but let’s unpack them a little bit and see if we can improve team morale.