Situational Awareness - 5D Project Model

5D is not just for BIM!

D. Brown Management Profile Picture
Share

The best project team members have a complex 5-dimensional model of the project in their heads at all times. 

Situational Awareness on a Project. Concept, 3D Model, 4D Schedule, 5D Cost.

They see not only the finished product in 3D but can take that model apart down to the individual components of each building system.  They see the sequence and speed that each of those components must be put in place (4th dimension). They see the cost of each component and the different methods that can be used to put them in place (5th dimension).  

BIM has the power to create a detailed 5D computer model and this technology is a huge help for project teams.  It is however not a substitute for building “Situational Awareness” across the project team.  This is what lean construction tools such as “Pull Planning”  develop in teams. 

Situational Awareness is something critical to survival training, military, construction projects, contracting businesses and life in general.  The US Coast Guard has a great chapter in one of their training manuals on Situational Awareness.


Look up the “Two-Challenge Rule” on page 6 and ask yourself if that is applicable to having effective bid or project review meetings?  




Retirement Onboarding - Introduction
Retirement Onboarding is something that construction business owners must regularly be working on for themselves and other key team members.
Cash Flow Tip 10 - Submittals and Managing All Deliverables
Submittals are one of the first deliverables to your customer on the project and when done correctly, will set you up for success throughout the project.
Cash Flow Tip 16 - 5/10/15 Collection Process
Use the 5/10/15 Collection Process to ensure faster payments. Don’t let the marginal gains achieved so far with Cash Flow Tips 1-15 get squandered by poor collection practices.