Planning a Project - 2X Organizational Chart

A contractor would never start to build a facility by trying to design and build a room or two at a time.

D. Brown Management Profile Picture
Share

You don’t have to have every single detail figured out when you build a new facility to get started and interior details often change over the life cycle of the building.  

Leadership Tools: 2X Organizational Chart.

What you do start with is the bigger picture - overall size of the site, facility and key infrastructure.  If it is for a rapidly growing business the facility may be designed as one of many on a larger site or designed for easy expansion down the road.  This is done because we all know that for a facility from need identification until the new facility capacity is built will take a minimum of 18-24 months.   

Contractors  must apply that same planning time horizon to their organizational structures.  At the field supervisor level and above the timeline to recruit and / or develop someone into a key position takes a while.  For key management roles it often takes 2+ years for someone to become truly effective in the role.  

Many problems including quality issues, margin fade and bad growth can be traced back to the organizational structure.   


How effective is your org structure?  

Do you have a 5 year org structure plan?

A third party can be very effective for developing your 2X org chart because they will challenge structure, roles and current team capabilities without bias while bringing in outside expertise. 

Learn how we can help




Building a Systems Development Team - Introduction
Construction technology innovation is accelerating and the contractors that learn how to effectively integrate technology into every aspect of their business will dominate tomorrow.
001 - Stages of Construction Contractor Growth (Intro)
Every contractor grows through six general stages with each requiring different strategies, systems, structure, and leadership focus. 90-minute discussion covers the basic challenges with examples for all levels.
Cash Flow Explained
Contractors run on very thin profit margins however cash flow is even more important for sustainable growth. Poor cash flow is a primary reason for contractors failing or their profitable growth being seriously constrained.