Failure is a Potent Teacher

Failure is a very potent teacher for construction contractors if:

D. Brown Management Profile Picture
Share
Leadership Tools: Failure is a Potent Teacher.
  • You don’t define failure just as CATASTROPHIC events that seriously damage your business.  
  • You define failure broadly as ANYTHING that is not adding value to the customer or slowing your progress.  
  • You embrace failure as part of the learning process diving deeply into the Root Cause Analysis (RCA). 
  • You develop a culture and systems so that everyone on the team thinks about the business as a series of interrelated cycles.  Consider all the interrelated cycles from the installation of a light fixture in the field to to the monthly project review meetings to the annual business planning process.  
  • Your whole team views each cycle as an opportunity to improve (PDCA)
  • You have developed structured processes for continuously updating your Standard Operating Procedures (SOPs) as your team learns then rolling them out across the company improving the whole team’s capabilities.  

Book Resources:

The Five Elements of Effective Thinking

Thinking in Bets

Related LinkedIn Posts:  

Churchill - Failure is NOT Fatal

Fail 9 Times to Succeed




Jennifer Blackwood - Difficult People
Ultimately there is exactly one person on this planet who you have 100% control over - YOU! The best way to work effectively with difficult people is to look within and figure out what you need to do to make the relationship less difficult; then do it!
Winning Projects - The Early, Middle, and Late Game
Successfully winning projects starts with knowing all phases of the game. All contractors participate in the "Late Game." Playing the "Early Game" effectively positions contractors to win more frequently, with better pricing, and better terms.
Levels of the Value Stream
For contractors to unlock maximum value during business development, preconstruction and project execution it is critical to understand the broader value stream of the project beyond their scope. 10 levels of granularity in the construction value stream: