Failure is a Potent Teacher

Failure is a very potent teacher for construction contractors if:

D. Brown Management Profile Picture
Share
Leadership Tools: Failure is a Potent Teacher.
  • You don’t define failure just as CATASTROPHIC events that seriously damage your business.  
  • You define failure broadly as ANYTHING that is not adding value to the customer or slowing your progress.  
  • You embrace failure as part of the learning process diving deeply into the Root Cause Analysis (RCA). 
  • You develop a culture and systems so that everyone on the team thinks about the business as a series of interrelated cycles.  Consider all the interrelated cycles from the installation of a light fixture in the field to to the monthly project review meetings to the annual business planning process.  
  • Your whole team views each cycle as an opportunity to improve (PDCA)
  • You have developed structured processes for continuously updating your Standard Operating Procedures (SOPs) as your team learns then rolling them out across the company improving the whole team’s capabilities.  

Book Resources:

The Five Elements of Effective Thinking

Thinking in Bets

Related LinkedIn Posts:  

Churchill - Failure is NOT Fatal

Fail 9 Times to Succeed




Talent Development Quote - Jack Welch
From 1981 through 2001 under CEO Jack Welch, GE’s market cap (value) grew 18% compounded annually from $14B to $410B. A large part of this profitable growth was due to the rigor placed on their talent development processes directly from the CEO.
Higher Scores Aren’t Always Better: Percent Planned Complete (PPC) Example
Construction is full of competitive personalities - more is always better. This is not always the case, and you must be careful when setting targets that your goals don't have unintended consequences. Percent Planned Complete (PPC) is a perfect example.
Project Delivery - Design-Build
The Design-Build method of project delivery eliminates a couple of the major negatives inherent in the Design-Bid-Build method, integrating construction and design by putting the contractor fully in charge of the process.