Construction Technology Integration Failures

More construction technology integrations FAIL to meet expectations due to alignment with the talent than the capabilities of the technology.

D. Brown Management Profile Picture
Share

If we looked at talent and technology the same way we look at heavy equipment on a jobsite we would achieve a much better return. 

Leadership Tools: Sustainable Growth Through Balanced Execution. Technology Integration Failure.

Construction equipment and technology are both large investments.  They are both critical for running a contracting business effectively.  They are both critical for building a project. 


The operators of the equipment are all trained and certified to a certain base level of competency to use particular pieces of equipment.  Some of these certifications are required by outside agencies.  

  • How do you train then “certify” that each member of your team is capable of using your technology systems?  

Mechanics are dedicated to take meticulous care of the equipment including regular lubrication, fueling and check-ups.  On a scheduled basis the equipment is taken out of production for an overhaul.    

  • What support systems does your technology have? 
  • How frequently are the systems reviewed?  
  • How much time and money is spent on major overhauls or integrations?  

Even with the best equipment and operators they still have to be organized in the right sequence then actively managed to ensure maximum productivity.  

  • Are your technology systems aligned in that way?
  • Can you visibly see the productivity of your team when it comes to your technology systems?



16 Reasons for Scoreboard and Scorecard Failure
Keeping score is foundational for success in construction, sports, and many aspects of life. Too frequently, scorekeeping fails to deliver improved results. Here are the 16 reasons why from the changes required by growth through systems and management.
8 Factors in Winning at the RFP Stage for CMAR Projects
After developing the opportunity, the Request for Proposal (RFP) is the first gate you have to get through to win a CM @ Risk project. Scoring is different from each project owner but there are eight major factors.
Contractor Business Model: Evolution with Stages of Growth
As a contractor navigates the different stages of growth, the complexity of their business model evolves, including their organizational structure, management systems, and people. Seeing this model visually helps identify bottlenecks and constraints.