Construction Technology Integration Failures

More construction technology integrations FAIL to meet expectations due to alignment with the talent than the capabilities of the technology.

D. Brown Management Profile Picture
Share

If we looked at talent and technology the same way we look at heavy equipment on a jobsite we would achieve a much better return. 

Leadership Tools: Sustainable Growth Through Balanced Execution. Technology Integration Failure.

Construction equipment and technology are both large investments.  They are both critical for running a contracting business effectively.  They are both critical for building a project. 


The operators of the equipment are all trained and certified to a certain base level of competency to use particular pieces of equipment.  Some of these certifications are required by outside agencies.  

  • How do you train then “certify” that each member of your team is capable of using your technology systems?  

Mechanics are dedicated to take meticulous care of the equipment including regular lubrication, fueling and check-ups.  On a scheduled basis the equipment is taken out of production for an overhaul.    

  • What support systems does your technology have? 
  • How frequently are the systems reviewed?  
  • How much time and money is spent on major overhauls or integrations?  

Even with the best equipment and operators they still have to be organized in the right sequence then actively managed to ensure maximum productivity.  

  • Are your technology systems aligned in that way?
  • Can you visibly see the productivity of your team when it comes to your technology systems?



Required Leadership Focus Changes at Each Stage of Growth
At each stage of growth, the leadership focus at the top for majority Owners/CEO/President must change to continue navigating growth effectively. Concurrently, the leadership focus from the prior stage of growth must be transferred and expanded downward.
Focused Resources = Maximum Results
Contracting is a relatively low-margin and high-risk business. Contractors can’t afford to spread out their resources on projects or in their businesses. Leaders must put maximum resources behind their biggest bottlenecks or opportunities.
Feedback - Build up, Don't Beat Up
Talent development is often slowed down because people don’t know how to give productive feedback. The skills of giving, receiving and acting upon feedback can be developed.