BIM Culture

Virtual Design & Construction (VDC) is changing every aspect of project delivery.

D. Brown Management Profile Picture
Share
Leadership Tools: Quote: BIM is 10% technology and 90% sociology. Scott Simpson. Book: BIM and Construction Management by Brad Hardin and Dave McCool.

There is a lot of technology involved and many technical challenges.  But ultimately the biggest challenges are about talent:

  • Working collaboratively across functional areas and companies
  • Learning new things - constantly
  • Dealing with setbacks - constantly
  • Longer range project planning than is typical
  • Planning with a greater attention to detail than is typical
  • Designing for fabrication and installation with automation where possible 
  • Greater transparency across everyone on the whole project delivery team

Learn More:


We spend a lot of time improving workflows at the project and company level.  A high-involvement approach is nearly always best and that requires breaking down a lot of walls while building a culture of collaboration and problem solving without blame. 

Schedule a call to learn more. 




The Contractor Scoreboard - A Contractor Must Do 3 Things
This outcome-based scoreboard keeps everyone focused on what matters. Avoid metric overload and diffusion of resources. All other metrics throughout all levels of the organization fall into a hierarchy below these with priorities changing over time.
Percent Planned Complete (PPC) - Calculation Example
Yoda would be the perfect coach for managing schedules on projects: “Do or do not. There is no try.” This is the heart of Percent Planned Complete (PPC) and the weekly cycle of continuous production improvement.
Rockefeller and Dealing With People
“Hard Skills” including the technical ability to design and build a project are the foundation of the construction industry. The “Soft Skills” such as the ability to deal with people is the glue that holds complex projects and contractors together.