Agile Project Management vs. Critical Path Method

The Critical Path Method (CPM) of project management is very commonly used in the management of construction projects.

D. Brown Management Profile Picture
Share

CPM works very well when the components of the design and the project are mostly known to all responsible parties. CPM focuses on either a single value-delivery event such as the completion of a building or in major phases such as turning over a floor at a time.  

Management Tools: Agile Project Management vs Critical Path Method (CPM).

CPM does not work as well in situations where there are significant “Known-Unknowns” about the plan CPM really breaks down when there are “Unknown-Unknowns”:

  • The final destination isn’t crystal clear; even to the leader
  • The path to get there has unknowns
  • The tools and tactics required to get there aren’t known to the team

In these situations more agile management methods are required either in conjunction with or to replace CPM:

There are similarities between all methods.  Develop the systems that work best for your company at this point in time.




Project Delivery - CM Agency or Multi-Prime
Project Owners can minimize the markups for overhead and profit by contracting directly with the specialty contractors and hiring a Construction Management (CM) firm to work as their agent. This project delivery method is called CM Agency or Multi-Prime.
Bruce Lee - "Be Like Water"
Be like water - an amazingly simple and powerful piece of wisdom from Bruce Lee. As the construction industry continues to get more complicated sometimes it is important to back up and look at simplicity.
Headcount, Stages of Contractor Growth, and Growth Inflection Points
Every contractor will navigate very predictable stages of growth. Each of these represents about a tripling of headcount and requires different leadership focus, strategies, structures, and systems. Stress and failure points are also very predictable.