Agile Project Management vs. Critical Path Method

The Critical Path Method (CPM) of project management is very commonly used in the management of construction projects.

D. Brown Management Profile Picture
Share

CPM works very well when the components of the design and the project are mostly known to all responsible parties. CPM focuses on either a single value-delivery event such as the completion of a building or in major phases such as turning over a floor at a time.  

Management Tools: Agile Project Management vs Critical Path Method (CPM).

CPM does not work as well in situations where there are significant “Known-Unknowns” about the plan CPM really breaks down when there are “Unknown-Unknowns”:

  • The final destination isn’t crystal clear; even to the leader
  • The path to get there has unknowns
  • The tools and tactics required to get there aren’t known to the team

In these situations more agile management methods are required either in conjunction with or to replace CPM:

There are similarities between all methods.  Develop the systems that work best for your company at this point in time.




Levels of Strategic Decisions (The Basics)
There are many "Strategic Possibilities" developed from "Strategic Brainstorming" that must be explored to make choices that will best position a contractor to win over the long-term. These "Strategic Decisions" must be made and integrated at all levels.
Levels of Design / Development / Detail - Beyond just Design
Contractors can improve business results by applying many of the same processes and vocabulary to their business that the industry is applying to projects. Consider how the different Levels of Detail (LOD) could be applied to your planning processes.
Ownership Transition Timelines
While it is possible for ownership transition timelines to be accelerated, that largely depends on the current condition of the company, including the management team and current owner.